About

Bulla Road to Power Street

Transurban and CPB Contractors are upgrading the freeway and CityLink between Bulla Road and Power Street. 

Upgrades to this 15.8 kilometre section include:

  • new lanes in both directions
  • a new inbound exit at Bulla Road 
  • a new separated road to Bell Street from the Tullamarine and Calder freeways
  • a new Bell Street to Pascoe Vale Road connection
  • improvements to the interchange at Flemington Road / Mount Alexander Road
  • improvements to the Bolte Bridge / West Gate Freeway connection
  • a new freeway management system.

Bell Street interchange upgrade

We are building a new bridge to connect Bell Street and Pascoe Vale Road. We are also adding an extra outbound lane from Bell Street onto the freeway.

Find out more about the upgrades to the Bell Street interchange.

New inbound exit at Bulla Road / separated road to Bell Street

We are adding a new two-lane road to connect the Calder and Tullamarine freeways to Bell Street. This will reduce weaving, a major cause of congestion in this area.

Find out more about the separated road to Bell Street

Flemington Road / Mount Alexander Road interchange upgrade

We are making this busy interchange safer and more reliable by changing how the traffic flows through it.

Find out more about the changes to the Flemington Road / Mount Alexander Road interchange.

Upgrading the Bolte Bridge's inbound connections to the West Gate Freeway

We are adding extra lanes and new technology to reduce congestion and improve safety on both the Bolte Bridge and the inbound lanes of the West Gate Freeway.

Find out more about the upgrades to the Bolte Bridge inbound connections to the West Gate Freeway.

Fact sheets

The information contained in these fact sheets is accessible on this website. They are provided here as PDF downloads for your convenience.

Questions?

If you have any questions about what's happening between Bulla Road and Power Street then contact us on 1300 783 947 (select option 1) or ctwbullatopower@cpbcon.com.au.